In 2018, it was used in batches in Wushan wind farm of Fujian Province and until now it has been running for more than five years without any failure.
Read MoreWind turbine test equipment:The test cluster is used to test the wiring correctness and functional integrity of the large components (tower bottom platform, generator, nacelle and rotor) and the wind turbine.
Read MoreAt present, a batch of them has been used in the electric control system of wind turbine.
Read MoreIn July 2023, 200kWh grid forming intelligent energy storage system was connected to the grid successfully.
Read MoreOver 4,000 sets of onshore and over 1,000 sets of offshore main control and pitch control systems are in operation at the site, of which the longest operation time has more than 10 years.
Read MoreMore than 1000 offshore hydraulic systems have been delivered from the factory are in operation at the site, with the longest operation time being more than 5 years.
Read More